{"id":5373,"date":"2026-11-20T22:06:24","date_gmt":"2026-11-21T06:06:24","guid":{"rendered":"https:\/\/www.26yc.com\/april-not-january-sets-the-plate-count\/"},"modified":"2026-11-20T22:06:24","modified_gmt":"2026-11-21T06:06:24","slug":"april-not-january-sets-the-plate-count","status":"publish","type":"post","link":"https:\/\/www.26yc.com\/de\/april-not-january-sets-the-plate-count\/","title":{"rendered":"April, Not January, Sets the Plate Count"},"content":{"rendered":"<h1>April, Not January, Sets the Plate Count<\/h1>\n<p>Most heat-exchanger enquiries still arrive as a single point. One duty in kilowatts, one supply temperature, one return temperature, and a request for a price before Friday. We used to size from that point too, taking the coldest hour as the governing case. A network does not operate on one point. It operates on a twelve-month curve, and the curve often puts its smallest driving force in a month nobody thought to log.<\/p>\n<p>The direction of travel is not in dispute. IEA DHC&#8217;s Annex XI transformation roadmap describes future networks at 55\/25 &deg;C and notes that older building stock may still need 70\/40 &deg;C in the coldest periods. Annex XII&#8217;s STEP summary sets out 90\/45, 80\/35, 60\/30 and 65\/35 as separate transition steps, and says 25&ndash;30 &deg;C return is reachable through control and hydraulic balance without touching the buildings. Those are trajectories, not nameplates. A substation that returns 30 &deg;C in February can still return 45 &deg;C in October.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/www.26yc.com\/wp-content\/uploads\/2026\/11\/april-not-january-sets-the-plate-count.svg\" alt=\"Two charts: monthly district-heating return temperatures and the derived plate area required as a share of the January peak, showing April at about 70 percent of peak area despite 45 percent of peak duty\" style=\"max-width:100%;height:auto;border:1px solid #e6ebef;border-radius:8px;\" \/><figcaption>The coldest month gives the largest duty. A shoulder month gives the smallest temperature driving force.<\/figcaption><\/figure>\n<h2>Four months from one substation<\/h2>\n<p>Here is a set we were asked to check. It is a mixed space-heating and domestic-hot-water substation on a northern-European three-generation network. Only four months are shown, but the calculation was run on all twelve. Specific heat of water is taken as 4.18 kJ\/(kg&middot;K); the exchanger is counterflow, so &Delta;T<sub>1<\/sub> is hot inlet minus cold outlet and &Delta;T<sub>2<\/sub> is hot outlet minus cold inlet.<\/p>\n<table>\n<thead>\n<tr>\n<th>Month<\/th>\n<th>Primary (supply\/return)<\/th>\n<th>Secondary (in &rarr; out)<\/th>\n<th>Duty<\/th>\n<th>LMTD<\/th>\n<th>Area needed, Jan = 100<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>January<\/td>\n<td>80 \/ 42 &deg;C<\/td>\n<td>35 &rarr; 50 &deg;C<\/td>\n<td>2.00 MW<\/td>\n<td>15.80 K<\/td>\n<td>100<\/td>\n<\/tr>\n<tr>\n<td>April<\/td>\n<td>60 \/ 40 &deg;C<\/td>\n<td>35 &rarr; 42 &deg;C<\/td>\n<td>0.90 MW<\/td>\n<td>10.15 K<\/td>\n<td>70<\/td>\n<\/tr>\n<tr>\n<td>July (DHW only)<\/td>\n<td>55 \/ 45 &deg;C<\/td>\n<td>10 &rarr; 50 &deg;C<\/td>\n<td>0.25 MW<\/td>\n<td>15.42 K<\/td>\n<td>13<\/td>\n<\/tr>\n<tr>\n<td>October<\/td>\n<td>65 \/ 44 &deg;C<\/td>\n<td>35 &rarr; 45 &deg;C<\/td>\n<td>0.70 MW<\/td>\n<td>13.78 K<\/td>\n<td>40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Work January by hand so the rest can be checked. &Delta;T<sub>1<\/sub> = 80 &minus; 50 = 30 K, &Delta;T<sub>2<\/sub> = 42 &minus; 35 = 7 K, LMTD = (30 &minus; 7) \/ ln(30\/7) = 15.80 K. Required UA is 2,000 kW \/ 15.80 K = 126.6 kW\/K. April: &Delta;T<sub>1<\/sub> = 18 K, &Delta;T<sub>2<\/sub> = 5 K, LMTD = 10.15 K, and UA = 900 \/ 10.15 = 88.7 kW\/K. That is 70 per cent of the January surface at 45 per cent of the January duty.<\/p>\n<p>The flow numbers are worse than the area numbers. January primary flow is 2,000 \/ (4.18 &times; 38) = 12.6 kg\/s, about 45 m&sup3;\/h. April is 900 \/ (4.18 &times; 20) = 10.8 kg\/s, about 39 m&sup3;\/h. The load fell by more than half and the pump still moves 86 per cent of the winter flow, because weather compensation lowered the supply without lowering the return by the same amount. The network lost 20 K of temperature spread and kept the circulation.<\/p>\n<p>This is the trap in the familiar advice to lower supply temperature. Mean network temperature does fall, and distribution losses fall with it; a 20 K reduction in mean temperature is commonly put at roughly 25&ndash;30 per cent less loss. But the plate pack does not see the loss figure. It sees the 18 K and 5 K endpoints. Lowering supply from 80 to 60 &deg;C while the return moves from 42 to 40 &deg;C cuts the spread from 38 K to 20 K, and the exchanger has to do 45 per cent of the winter duty through a driving force that is 36 per cent smaller.<\/p>\n<h2>Where the second pack goes<\/h2>\n<p>We split this job into two packs in a common frame, and not for the usual reason. The first pack is sized on the envelope of the twelve monthly UA values, not on the peak kilowatts. The frame, nozzles, valve positions and foundation are built for the second pack. Whether the second pack ever gets installed depends on what happens to the return curve, not on a forecast of load growth.<\/p>\n<p>That last point is worth dwelling on. A lower return temperature improves the cold end and raises LMTD, so it <em>reduces<\/em> the area required for the same duty. Buying extra plates to &#8220;achieve&#8221; a low return is backwards. Annex XI lists three routes to lower temperature levels: eliminate existing temperature errors, use longer thermal length in substation exchangers, and reduce customer-side temperature demand. Thermal length is a dimensionless number, not a plate count. Adding surface without fixing the control loop gives a larger, colder-looking machine that still returns hot water, because the valve sits at a comfortable margin above setpoint. Low return is a control outcome that the exchanger makes possible.<\/p>\n<p>We also check the months nobody quotes. Below roughly 0.2 m\/s at summer duty, distribution across the channels turns patchy and fouling accelerates in the quiet zones. Where the annual profile has a genuine turndown beyond about four to one, two packs or two sections behave better than one generous unit. If the control valve is below roughly 20 per cent open for most of the year, the arrangement is wrong even though the calculated area is right.<\/p>\n<h2>What goes into the enquiry<\/h2>\n<ol>\n<li>Twelve monthly primary supply and return temperatures, read from the heat meter rather than taken from the design brief.<\/li>\n<li>Twelve monthly secondary inlet and outlet temperatures, with domestic hot water separated from space heating.<\/li>\n<li>The share of annual duty that is domestic hot water. July is not a small January; it is a different temperature programme.<\/li>\n<li>Where the meters sit. A return probe on a common manifold after the DHW preheat section is not the same measurement as one at the substation flange; our <a href=\"\/de\/meter-position-changes-pue-heat-reuse-enquiry\/\">note on metering position<\/a> covers why ratios move when the meter moves.<\/li>\n<li>The hours attached to each condition. A month with a bad LMTD and sixty operating hours is a different commercial question from one with six hundred.<\/li>\n<\/ol>\n<p>If items one to three do not arrive, we say so in the offer and price against a stated shoulder-month assumption. We do not present a single design-point number as though it covered the year. The <a href=\"\/de\/how-we-check-numbers-editorial-note\/\">editorial note on sources<\/a> explains the same rule for published figures: a number without its boundary is not yet a specification.<\/p>\n<h2>A correction to our own note<\/h2>\n<p>In last week&#8217;s piece on metering position we wrote that the <a href=\"\/de\/two-kelvin-approach-liquid-cooling\/\">hot-end approach<\/a> comes out of the worst month. That sentence is too loose. The worst month for duty and the worst month for approach are not necessarily the same month, and in the example above they are four months apart. What should have been written is that both come out of the monthly series. We have left the original text up rather than quietly editing it, because the distinction is the whole point of this article.<\/p>\n<p>The same logic runs through the rest of the chain. The <a href=\"\/de\/one-megawatt-running-four-point-two-on-paper\/\">Geneva phased project<\/a> showed how a running megawatt and a paper megawatt are different heat balances. Here the running quantity is the curve and the paper quantity is the design point. To turn hours and temperatures into money, use the <a href=\"\/de\/tools\/heat-recovery-roi-calculator\/\">ROI calculator<\/a>; it asks for temperatures and operating hours for exactly this reason. And for the full path from source to network, start with the <a href=\"\/de\/data-center-waste-heat-recovery-guide\/\">data centre waste heat recovery guide<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Ask for the curve. The design point is one month out of twelve.<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[243],"tags":[],"class_list":["post-5373","post","type-post","status-publish","format-standard","hentry","category-design-calc"],"_links":{"self":[{"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/posts\/5373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/comments?post=5373"}],"version-history":[{"count":0,"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/posts\/5373\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/media?parent=5373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/categories?post=5373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.26yc.com\/de\/wp-json\/wp\/v2\/tags?post=5373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}