{"id":5356,"date":"2026-11-11T18:28:46","date_gmt":"2026-11-12T02:28:46","guid":{"rendered":"https:\/\/www.26yc.com\/two-kelvin-approach-liquid-cooling\/"},"modified":"2026-11-11T18:28:46","modified_gmt":"2026-11-12T02:28:46","slug":"two-kelvin-approach-liquid-cooling","status":"publish","type":"post","link":"https:\/\/www.26yc.com\/ko\/two-kelvin-approach-liquid-cooling\/","title":{"rendered":"The 2 K That Decides Whether a Liquid-Cooled Rack Can Feed a Heat Network"},"content":{"rendered":"<h1>The 2 K That Decides Whether a Liquid-Cooled Rack Can Feed a Heat Network<\/h1>\n<p>Ask a data centre team how much heat they can recover and you will get a megawatt number. Ask what temperature the district heating network returns at, and the room usually goes quiet. The second question is the one that sizes the exchanger.<\/p>\n<p>Direct-to-chip cold plates hand you coolant at roughly 45\u201355\u00b0C in most 2026 deployments. A fourth-generation district network runs about 50\u201360\u00b0C supply and 30\u201340\u00b0C return. Those two ranges nearly touch, which is why the current wave of heat-reuse projects is a liquid-cooling story and not an air-cooling story. Air-cooled halls reject heat at 25\u201335\u00b0C; the lift is so large that the heat pump eats the margin.<\/p>\n<h2>Work the arithmetic at the interface<\/h2>\n<p>Take a 1 MW recovery duty. Source water arrives at 50\u00b0C and leaves at 45\u00b0C. Network water comes back at 35\u00b0C and we want to deliver 48\u00b0C. In counter-flow the terminal differences are 50 &#8211; 48 = 2 K at the hot end and 45 &#8211; 35 = 10 K at the cold end:<\/p>\n<p>LMTD = (10 &#8211; 2) \/ ln(10 \/ 2) = <strong>4.97 K<\/strong>. With U = 3,000 W\/m2K for a water-to-water plate exchanger, UA = 1,000,000 \/ 4.97 = 201,000 W\/K, so the required area is about <strong>67 m2<\/strong>.<\/p>\n<p>Relax the hot-end approach to 5 K by delivering 45\u00b0C instead of 48\u00b0C and the LMTD rises to (10 &#8211; 5) \/ ln(10 \/ 5) = 7.21 K. Area falls to about <strong>46 m2<\/strong>. That is a third of the plate pack, gone, because someone accepted three degrees less on the delivery temperature.<\/p>\n<figure><img decoding=\"async\" src=\"https:\/\/www.26yc.com\/wp-content\/uploads\/2026\/11\/two-kelvin-approach-liquid-cooling.svg\" alt=\"Counter-flow temperature profile comparing a 2 K and a 5 K hot-end approach, with resulting LMTD and plate area\" style=\"max-width:100%;height:auto;border:1px solid #e6ebef;border-radius:8px;\" \/><figcaption>Same 1 MW duty. The approach temperature, not the megawatt number, sets the plate pack.<\/figcaption><\/figure>\n<p>Now put the pump on the balance sheet. At 5 K temperature change on the water side, mass flow is 1,000,000 \/ (4,180 x 5) = 47.8 kg\/s, about 172 m3\/h. If each side of the exchanger costs 30 kPa and the pumps run at 70% efficiency, that is 2 x (30,000 x 0.0478 \/ 0.7) = <strong>4.1 kW<\/strong>, or 0.4% of the recovered duty. Cheap. Which is exactly why we tell clients not to buy a smaller, tighter exchanger to save capital: the fan and pump penalty is not where this project fails.<\/p>\n<h2>Where it does fail<\/h2>\n<p>The network may not want 48\u00b0C in July. A data centre produces heat 8,760 hours a year at an almost flat rate; a heating network absorbs it for perhaps 3,000\u20134,500 hours, concentrated in winter. A third-generation network with a 60\u201370\u00b0C return is worse than useless here \u2014 the return is hotter than the source, so the entire duty has to go through a heat pump with a 30\u201340 K lift. We have seen feasibility studies that quote a recovered MWh figure without ever stating the network return temperature. We do not accept those studies as a design basis.<\/p>\n<p>Our position, and we have argued it with more than one integrator: <strong>the heat purchase agreement should be drafted before the plate exchanger is sized<\/strong>. It fixes delivery temperature, annual offtake hours, and who carries the summer surplus. Only then does the 2 K versus 5 K decision become an engineering trade rather than a guess.<\/p>\n<h2>What this means for the air-side equipment<\/h2>\n<p>There is still an air-to-air job in these buildings \u2014 support spaces, UPS rooms, battery rooms, and the residual air-cooled fraction of the hall. That is where <a href=\"\/ko\/liquid-cooling-waste-heat-reuse\/\">liquid-cooling and immersion waste-heat reuse<\/a> meets the more mundane <a href=\"\/ko\/heat-exchanger-pressure-drop-explained\/\">pressure-drop calculation for ventilation cores<\/a>. Keep the two loops separate in the specification. A plate heat exchanger on a 50\u00b0C water loop and a cross-flow core on a 30\u00b0C exhaust airstream are not interchangeable, and the <a href=\"\/ko\/plate-vs-rotary-vs-heat-pipe\/\">plate \/ rotary \/ heat-pipe comparison<\/a> applies to the second one only.<\/p>\n<p>If you want the full chain from server coolant to network substation, start with our <a href=\"\/ko\/data-center-waste-heat-recovery-guide\/\">data centre waste heat recovery guide<\/a>; the <a href=\"\/ko\/tools\/heat-recovery-roi-calculator\/\">ROI calculator<\/a> will show how sensitive payback is to the number of hours the heat is actually taken.<\/p>","protected":false},"excerpt":{"rendered":"<p>Same 1 MW duty: a 2 K approach needs 67 m2 of plate area, a 5 K approach needs 46 m2.<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[71],"tags":[],"class_list":["post-5356","post","type-post","status-publish","format-standard","hentry","category-heat-exchanger"],"_links":{"self":[{"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/posts\/5356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/comments?post=5356"}],"version-history":[{"count":0,"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/posts\/5356\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/media?parent=5356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/categories?post=5356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.26yc.com\/ko\/wp-json\/wp\/v2\/tags?post=5356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}