Heat Exchanger Supplier Verification Checklist

Run every RFQ (Chinese or any origin) through the 12 checks below. Mark Pass / Fail, capture evidence, and compute the weighted risk score before releasing any deposit.

#Verification checkWhat to request / evidencePassFailNotes / evidence ref
1Legal entity & export record
Weight 2
Unified Social Credit Code, registration address, customs export record for HS 8419/8479.
2Third-party certifications (verified)
Weight 3
CE, ISO 9001, AHRI/Eurovent, PED/ASME. Verify number with issuer.
3Factory audit (own or 3rd-party)
Weight 3
SGS/BV/TÜV audit: WPS/PQR, NDT, brazing calibration, traceability.
4Material traceability
Weight 3
EN 10204 3.1 mill certs; heat numbers match physical stamp.
5Pressure & leak test evidence
Weight 3
Hydrostatic 1.3–1.5× design; helium leak <1e-6 mbar·L/s for brazed. Witnessed.
6First-article inspection (FAI)
Weight 2
Sign-off against drawing before series run; referenced in PO.
7References & operating sites
Weight 2
3 reference projects in your application; call ≥1 operator.
8Thermal calculation review
Weight 2
NTU-ε/LMTD sheet with fouling allowance; sanity-check vs spec.
9Warranty & spare-parts policy
Weight 2
Period, exclusions, 10-yr spares, return-freight responsibility.
10IP protection (NNN + jurisdiction)
Weight 2
Signed NNN with neutral arbitration venue before drawing release.
11QC documentation package
Weight 2
ITP, CoC, dimensional report, packing list complete.
12Incoterms & logistics
Weight 1
FOB/CIF/DDU/DDP explicit, port named, inspect-before-load.

Weighted risk score

Checks passed (weighted): ___ / 27
Critical fails (wt ≥3): ___
Decision: APPROVE / CONDITIONAL / REJECT

Rule of thumb: any Fail on a weight-3 check = CONDITIONAL at best; two or more = REJECT. Score < 22/27 with no critical fail = APPROVE.