Waste Heat Recovery: Concepts and Payback

Inhaltsverzeichnis

Almost every industrial and commercial process rejects heat: exhaust gases, warm water, or hot product streams. Waste heat recovery captures that energy for reuse instead of dumping it.

  • High grade (>400 °C): Recuperators, regenerators, steam generation.
  • Medium grade (100–400 °C): Air-to-air plate or heat-pipe exchangers, absorption chillers.
  • Low grade (<100 °C): Ventilation recovery, pre-heating water, heat pumps.

  • Exhaust-to-supply air (HVAC, drying, booths)
  • Hot water pre-heat from process cooling
  • Exhaust-to-boiler combustion air
  • Heat-pump upgrade of low-grade heat to useful temperature

  • Operating hours (continuous beats seasonal)
  • Temperature difference (bigger ΔT = more recoverable energy)
  • Local fuel/electricity price
  • Capital and maintenance cost

For air-to-air ventilation and drying, payback of 1–3 years is typical; high-grade process heat can be under a year.

Is waste heat always worth recovering?
Not always. Very low temperature or intermittent streams may not justify equipment; a quick energy audit decides it.

Where do air-to-air exchangers fit?
They are the simplest, most cost-effective option for ventilation and low-grade exhaust, which is exactly where most buildings waste heat.

Verwandte Beiträge

Beginne damit, deinen Suchbegriff oben einzugeben und drücke Enter für die Suche. Drücke ESC, um abzubrechen.

Zurück nach oben