Change the Pre-Filter on Pressure Drop, Not on the Calendar

Change the Pre-Filter on Pressure Drop, Not on the Calendar

A maintenance contract said “replace G4 panels every three months”. The paint shop ran two shifts in winter and one in summer. In July the panels came out almost clean; in February they were loaded solid for six weeks. Nobody had done anything wrong. The schedule was simply written for an average site that does not exist.

The small number, and the large one

Take a 12,000 m3/h make-up air unit (3.33 m3/s) with a G4 panel starting at 45 Pa and a change-out setpoint of 120 Pa. Average differential over the loading cycle is about 82.5 Pa. At 62% fan efficiency:

  • Average fan power for the filter: 3.33 x 82.5 / 0.62 = 443 W.
  • If someone budgets against the clean 45 Pa figure: 3.33 x 45 / 0.62 = 242 W.
  • Difference: 201 W x 6,000 h = 1,206 kWh/year, about €145 at €0.12/kWh.

That is a small number, and we tell clients that to their face. If the only saving were €145, we would not write an article about it.

The real cost is downstream. A loaded or badly seated pre-filter lets dust through to the recovery core. On a paint booth or an oven exhaust that means a foil channel cleaning every six months instead of every two years: say €900 for a strip-down and chemical wash, plus four hours of lost production, twice a year. The filter itself costs €18. The plate exchanger cleaning guide shows what that strip-down involves; the mine ventilation case is the extreme version, where frost and dust combine.

Filter pressure drop rising over a loading cycle with a 120 Pa change-out setpoint, plus downstream core cleaning cost
The €18 part protects the €9,000 part. Budget the second number.

How we set the change-out point

Not from a catalogue. We put a differential pressure transmitter across the filter bank, log it for a few weeks, and set the alarm at the pressure where the fan can no longer hold design airflow — or earlier, if the downstream core is sensitive. For a G4 panel on a general AHU that is often 100–150 Pa; for a coarse panel ahead of a compact plate core we set it lower. The filter maintenance guide walks through the measurement setup, and pressure drop and fan energy explains why the fan curve, not the filter datasheet, should decide the limit.

Two details from the sites where this went badly:

  • The frame, not the media. A new panel clipped into a warped holding frame bypasses around the edge. Measure across the whole bank, not across one panel.
  • Seasonal setpoints. In a cold climate, a loaded pre-filter reduces supply airflow exactly when frost risk on the exhaust face is highest. Our 防霜ガイド と wheel defrost strategies assume design airflow; they do not hold when the filter is blinded.

What belongs in the specification

Three lines: an initial pressure drop at rated airflow, a change-out differential with an alarm, and a requirement that the filter bank be sealed and measurable. Then add the monitoring point to the BMS handover. A calendar interval can stay in the maintenance manual as a backstop, but it should never be the control.

For the grade of pre-filter itself — panel, pocket, washable, G1 to G4 — see primary pre-filter selection、および the three-stage comparison if you are deciding what sits behind it.

適切な熱交換器を選定

当社のエンジニアが風量、温度、圧力損失の予算に合わせてコアを設計し、用途に応じて板式・回転式・ヒートパイプ回収を選定します。以下をお読みください: 熱交換器ガイド 、または仕様についてお問い合わせください。

見積りを依頼

関連製品

Air-to-Air Heat Exchanger

HVAC および換気向けの板式・回転式・ヒートパイプ回収。

Plate Heat Exchanger

空気と液体用の大表面積固定コア。

ロータリー熱回収ホイール

大風量向け高効率エネルギー回収。

Heat Pipe Heat Exchanger

清浄用途向けの受動的・完全分離流。

関連投稿

検索語を上に入力し、 Enter キーを押して検索します。キャンセルするには ESC を押してください。

トップに戻る
無料の熱回収計算ツールおよびサイジングツール