A purchasing department sent us a specification last month that asked for a 0.8 MPa hydrostatic test on a plate-type air-to-air core rated at 250 Pa. Three suppliers quoted three wildly different prices. Two of them priced a pressure vessel. The third asked, politely, whether anyone had read the scope clause.

The confusion is understandable. China’s revised national standard GB/T 151-2026 Heat Exchangers was published in January 2026 and took effect on 1 August 2026, replacing the 2014 edition. It revises material selection, strength calculation, tubesheet design, tube-bundle grading, manufacturing inspection and — notably — adds energy-efficiency test and evaluation methods for shell-and-tube units. It is the core technical reference for pressure-bearing heat exchangers built or used in China. Buyers noticed. Then they pasted it into every enquiry they had.

Where the scope actually stops

GB/T 151 covers pressure equipment: shell-and-tube and similar vessels where the governing risk is mechanical failure under pressure. A ventilation recovery core is a different object. Its governing risks are air leakage between streams, frost at the exhaust face, pressure drop against a fan curve, and fouling that quietly removes 15% of the duty over two years. There is no design pressure in the vessel sense. Asking for a hydrostatic test tells us nothing about whether the core will survive a -12°C morning.

The difference is not academic. Take a 20,000 m3/h AHU with 180 Pa of core pressure drop. Fan shaft power at 62% efficiency is about (20,000 / 3,600) x 180 / 0.62 = 1.6 kW. The 0.8 MPa figure in that specification is roughly 4,400 times the static pressure the core will ever see. Applying welding-procedure qualification, radiographic examination and tube-expansion pull-out tests to a 0.1 mm aluminium foil stack adds cost and adds no information.

Scope map separating pressure-vessel heat exchanger standards from air-to-air energy recovery core standards
Two standard families, two failure modes. Mixing them in one acceptance table is where quotations go wrong.

What we put in the specification instead

Equipment in the package Standard family to cite What the test proves
Shell-and-tube / pressure vessel GB/T 151-2026, ASME VIII where specified Mechanical integrity under pressure
Air-to-air recovery core, ventilation duty GB/T 21087, EN 308, AHRI 1060 Sensible / latent effectiveness, pressure drop, carryover at a declared airflow
Microchannel exchanger GB/T 47194-2026 (effective 1 September 2026) Construction and rating for compact cores
Chemical-process tubular exchanger HG/T 2650-2026 (effective 1 November 2026) Non-fired tubular units, p up to 35 MPa
Whole AHU EN 13053 / EN 1886, Eurovent where required Casing leakage, thermal and acoustic performance of the assembled unit

Our own rule is boring and it works: the first line of the enquiry states what the package does not contain. If there is a steam coil or a pressure vessel in the same order, it gets a separate section with its own codes and its own acceptance records. The core section then asks for four numbers at the design airflow — effectiveness, pressure drop on both sides, exhaust-air transfer ratio, and the frost-control setpoint. Those are the numbers that decide whether the unit works in February.

One more thing we insist on, and it is not in most templates: the test report must show the airflow and face velocity at which effectiveness was measured. A catalog that says “80%” without a rating point is not a claim we can check. Our guide to reading an air-to-air test report walks through the fields we ask suppliers to fill in, and the EN 308 test method explains why the rating conditions matter more than the headline percentage.

What changed for us in 2026

We used to keep a single “standards” line in our datasheets. After three standards landed in four months — GB/T 151 in August, the microchannel standard in September, HG/T 2650 this month — we split it into a table like the one above. It costs an extra ten minutes per quotation and removes an entire category of dispute at factory acceptance. If you are writing a 2027 specification, do the same before you send it out.

Related on 26YC: verifying CE, AHRI and Eurovent claims, AHRI 1060 rating conditions, and the standards glossary.

適切な熱交換器を選定

当社のエンジニアが風量、温度、圧力損失の予算に合わせてコアを設計し、用途に応じて板式・回転式・ヒートパイプ回収を選定します。以下をお読みください: 熱交換器ガイド 、または仕様についてお問い合わせください。

見積りを依頼

関連製品

Air-to-Air Heat Exchanger

HVAC および換気向けの板式・回転式・ヒートパイプ回収。

Plate Heat Exchanger

空気と液体用の大表面積固定コア。

ロータリー熱回収ホイール

大風量向け高効率エネルギー回収。

Heat Pipe Heat Exchanger

清浄用途向けの受動的・完全分離流。

関連投稿

検索語を上に入力し、 Enter キーを押して検索します。キャンセルするには ESC を押してください。

トップに戻る
無料の熱回収計算ツールおよびサイジングツール