CHP Case Study: Cogeneration in a Real-World Facility

목차

에이 12,000 m2 district with a hospital wing, pool, and offices had a steady year-round heat demand and paid high grid electricity prices. A 500 kWe natural-gas CHP engine was installed to supply base-load power and capture jacket plus exhaust heat for space heating and domestic hot water.

  • Electrical output: 500 kWe continuous.
  • Recovered heat: approx 650 kWth at 80-90C water.
  • Total fuel efficiency: ~85% vs ~40% for grid power alone.

The CHP covered the high-grade water loop, but the buildings still vented conditioned air. Adding plate air-to-air exchangers on the ventilation side captured the remaining low-grade exhaust, complementing the water loop described in our CHP overview.

  • Site CO2 cut by ~28%.
  • Energy cost reduced by ~22%.
  • Simple payback: 4.5 years.

CHP pays only when heat demand is continuous and matches engine output - oversizing wastes the advantage. Validate with a payback calculation and see waste-heat recovery basics for the full heat ladder.