Size the Core for the Peak. Bill the Project for the MWh It Can Actually Absorb.

Size the Core for the Peak. Bill the Project for the MWh It Can Actually Absorb.

A feasibility study lands on your desk with a 1 MW recovery duty and a simple payback. The first number is a peak. The second uses it as if it were an average. That single substitution is responsible for more disappointed heat-recovery projects than any equipment fault we have seen.

The duty point is real; the annual energy is not

Take the same interface we use elsewhere on this site: source water 50°C in, 45°C out; network water 35°C return, 45°C delivery. Terminal differences are 5 K and 10 K, so LMTD = (10 – 5) / ln(10 / 5) = 7.21 K. With U = 3,000 W/m2K on a water-to-water plate exchanger, a 1 MW peak needs UA = 139,000 W/K and an area of about 46 m2.

Now the annual ledger. The source runs 8,760 hours at essentially full output: 8,760 MWh available. A heating network with 3,500 hours of absorbable demand takes 3,500 MWh. In compact form:

Qannual = ∫ min( Qsource(t), Qsink(t) ) dt

At €30/MWh for delivered heat, the two ledgers give €263,000 and €105,000 a year. On a €500,000 interface package, that is the difference between a two-year payback and a five-year one. Same plate pack, same pump, same pipe. Only the offtake profile changed.

Constant 1 MW heat production curve over 8,760 hours against a seasonal 3,500-hour absorption curve
The shaded overlap is what gets paid for. The area above it is engineering, not revenue.

The wrong conclusion people draw

Someone usually says: then size the exchanger at 40% of peak. Do not. In January the network wants the full megawatt, and an 18 m2 plate pack will not deliver it. The core is sized by the winter peak and the terminal temperature differences at that peak. What changes is the business case, not the heat-transfer area.

If the payback no longer closes, the fix is on the demand side:

  • Accept partial utilisation and size for winter peak only. Cheapest first move. The plant still avoids cooling cost in shoulder seasons.
  • Add a buffer tank to shift a daily mismatch. Seasonal storage at this scale rarely pays.
  • Find a summer sink — an absorption chiller feeding the same campus, a greenhouse, a drying process. This is usually the option that actually moves the annual MWh.
  • Negotiate the offtake hours in the heat purchase agreement. A lower price for guaranteed summer offtake can beat a higher winter-only price.

Where the air-side calculation differs

Ventilation cores have a similar trap with a different shape. Their duty is set by airflow and the temperature difference between exhaust and outdoor air, so the peak occurs on the coldest design day — but most of the annual recovered energy happens at part-load, near the seasonal mean. Sizing on the design day and checking savings with the seasonal efficiency rather than the nameplate effectiveness is the equivalent discipline. The ε-NTU method gives you the effectiveness at each operating point; the 투자 회수 기간 계산 is where we sum them into MWh.

Our rule for the first page of any proposal: state the peak duty, the annual absorbed energy, and the assumed offtake hours, on the same line. If a study gives you only the first, it is a sizing document, not a business case. The ROI calculator lets you change the hours and see the answer move without rebuilding the whole model.

For the temperature and network constraints behind the duty point, start with liquid-cooling waste-heat reuse or the data centre recovery guide.

적합한 열교환기 선정

당사 엔지니어가 풍량, 온도, 압력 손실 예산에 맞춰 코어를 설계하고, 적용에 따라 판형·회전식·히트파이프 회수를 선택합니다. 다음을 읽으세요: 열교환기 가이드 , 또는 사양 관련 문의를 주세요.

견적 요청

관련 제품

Air-to-Air Heat Exchanger

HVAC 및 환기용 판형·회전식·히트파이프 회수.

Plate Heat Exchanger

공기 및 액체용 대면적 고정 코어.

회전식 열회수 휠

대풍량용 고효율 에너지 회수.

Heat Pipe Heat Exchanger

청정 적용을 위한 수동적·완전 분리 유동.

관련 게시물

위에 검색어를 입력하고 Enter 키를 눌러 검색하세요. 취소하려면 ESC 키를 누르세요.

맨 위로
무료 열회수 계산기 및 사이징 도구